KBTW Regulator Installation Guide


In order to solve the installation concerns of all customers, the regulator installation guide is made into micro information in the form of text and pictures, so that you can understand the entire installation process of the regulator anytime and anywhere. Now in China's voltage 380V environment with gold protection power KBTW regulator to explain the installation process.
One. Preparation
1.1. Determine the potential customer equipment information: circuit switch A number, voltage regulator capacity, equipment power demand capacity

1.2. Check whether the standard line layout of the 3 and 5 wires is correct. If it is incorrect, correct it.
1.3 Check whether the switching voltage is normal, whether the neutral line is pure, and whether the ground line is effective.
* The normal switching voltage is between 320-460V.
* Neutral line, ensure that it is a pure neutral line from the direct lead of the high voltage transformer,
< * Ground wire, make sure it is connected by a copper pin.
1.4. The customer needs to prepare a voltage regulator input 3 meters long 5-core cable, the square number is the same size as the equipment input, sometimes depending on the situation.

2. Observe the customer's onsite installation environment
2.1 Check whether the number A of the switch on the wall is consistent with the load device, whether the on-off contact of the switch is good, and whether the line value voltage is normal.
2.2 Test the mains input of the regulator with a multimeter, and the normal range of the conventional regulator is within 380V plus or minus 60V. If out of range should remind the customer to order a special range of regulators, so as not to conventional regulators can not meet the current environment of voltage regulation needs.
2.3 Observe the temperature, humidity, oil mist and dust in the air within 10 meters of the pressurizer installation location. If exceeding the standard will affect the service life of the regulator, please customers improve themselves.
Three. Installation work
3.1 Install the voltage regulator end, connect the 3-meter long 5-core cable from the wall switch to the voltage regulator input end, install the voltage regulator input end must be connected to the neutral line, the voltage regulator can work normally.

3.2 Installing the Device End. Generally, the device does not need the neutral line. Only the three-phase live line and ground cable are required

4. Check the work
4.1 Check whether all wiring terminals are secured
4.2 Voltage regulator power-on test no-load voltage and current
4.3 Power on the load device, check whether the phase sequence is correct, and the device is running normally.

400-6480-668

Hello!

金保電源

微信掃一掃

享一對一咨詢

主站蜘蛛池模板: 久久露脸精品nv511com | 精品国产三级A∨在线无码 午夜极品 | 老司机一级片 | 天天草av | 亚洲手机在线 | 欧美另类久久久精品 | 偷拍自拍视频在线 | 色综五月亚洲欧美婷婷 | 91中文字幕精品永久在线 | 亚洲欧美日韩免费 | 国产成人MV在线播放 | 西欧FREE性满足HD老熟妇 | 日韩无遮挡免费视频 | 一区二区三区产品乱码的解决方法 | 在线观看黄污 | 中文天堂av | 蜜桃一本色道久久综合亚洲精品冫 | 日韩国产一区二区三区四区五区 | www.粉嫩 | 国产青榴视频在线观看 | 精品成人一区二区三区四区 | 亚洲综合色视频 | 成人免费高清观看 | 国产精品伦理网 | 三黑人玩一女一男视频 | 国产一区二区在线免费观看视频 | 国产精品一区二区62 | 永久免费精品视频网站 | 亚洲精品激情视频 | 黄网在线观看免费 | 国产精品无人区一区二区三区 | 91新人在线?看| 啊灬啊灬啊灬快灬深一区二区 | 动漫黄网站 | 黑人黄色毛片 | 久久久高清免费视频 | 无码人妻AⅤ一区二区三区 YW193.CAN尤物国产在线网页 | 涩色av | 亚洲免费视频在线观看 | 中文字幕第九页 | 欧美色图国产精品 |